Description
Details Indigo and white stripe dress Fabric has no stretch Tiered skirt with ruffle flutter sleeves Pair this adorable dress with sandals and a fedora Skirt lined Size small from shoulder to hem: 33.5" Material and Care 85% rayon, 15% linen Hand wash, lay flat to dry Patterns may vary Materials may have natural var
Reviews
There are no reviews yet.